Is the sync interval configurable?
I want data entered in the Google Sheet to be available in Glide ASAP.
I’ve connected a google sheet as a data source, I’m not using zapier or any other middleware.
Is the sync interval configurable?
I want data entered in the Google Sheet to be available in Glide ASAP.
I’ve connected a google sheet as a data source, I’m not using zapier or any other middleware.
This topic was automatically closed 24 hours after the last reply. New replies are no longer allowed.