I love how much faster everything runs and updates on my app when using the Glide table instead of trying to write, read, and sync with google sheets. I want to rebuild everything inside Glide Tables for a better user experience. However, I still need to be able to pull and use all data in a google sheets format once or twice per day for operational and logistics reasons. Is there anyway to keep Glide Tables as the source of the data and just reference all that data from a google sheet? Basically the opposite of how it typically works? Instead of Glide reading and writing to and from Google Sheets, have my Goole Sheets read the Glide Table?
jcabs13
1
Related topics
| Topic | Replies | Views | Activity | |
|---|---|---|---|---|
| Is it possible automatically input to glide table? | 9 | 305 | August 19, 2023 | |
| Integrating Google Sheet into Glide Tables | 9 | 551 | March 18, 2024 | |
| Syncing Glide Table to a Google Sheets | 1 | 67 | January 8, 2025 | |
| How to populate a google sheet within glide from a glide table | 8 | 198 | February 3, 2024 | |
| Google sheet in Glide tables app | 5 | 408 | January 17, 2024 |