# The Case for Basic Scheduling Limits

**URL:** <https://community.glideapps.com/t/the-case-for-basic-scheduling-limits/16428>\
**Category:** Feature Requests\
**Created:** [September 27, 2020, 10:21pm UTC](https://community.glideapps.com/t/the-case-for-basic-scheduling-limits/16428 "2020-09-27T22:21:43Z")\
**Posts on this page:** 1\
**Showing post:** 2

<div class="post-metadata">

**Author:** ![Lucas\_Pires](https://sea2.discourse-cdn.com/flex002/user_avatar/community.glideapps.com/lucas_pires/32/64863_2.png) [@Lucas\_Pires](https://community.glideapps.com/u/Lucas_Pires)\
**Post date:** [September 28, 2020, 5:54am UTC](https://community.glideapps.com/t/the-case-for-basic-scheduling-limits/16428/2 "2020-09-28T05:54:51Z")

</div>

+1

And I’m still having some troubles with relations to recognize the date-time format…

> [@Date/Date-Time entry don't recognize Date/Date-Time column](https://community.glideapps.com/t/date-date-time-entry-dont-recognize-date-date-time-column/16216):
>
> Take a look on End Date Agendar and the date I’m tryna schedule in second screen point_down they’re exactly the same. In Data Editor I’m tryna do a relation to see, but it can’t recognize it as the same date-time… [image] I’ve already setup the column in google sheet, tried to setup in data editor and keep it like this. [image] In my Space Schedule when I click on the date, appears like this point_down could be something about how’s date is shown up in glide? [image]

---

_[View the full topic](https://community.glideapps.com/t/the-case-for-basic-scheduling-limits/16428)._
