# Switch to Google Sheets

**URL:** <https://community.glideapps.com/t/switch-to-google-sheets/32743>\
**Category:** Ask for Help\
**Created:** [October 7, 2021, 2:24am UTC](https://community.glideapps.com/t/switch-to-google-sheets/32743 "2021-10-07T02:24:36Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![SRblackbird](https://avatars.discourse-cdn.com/v4/letter/s/3ab097/32.png) [@SRblackbird](https://community.glideapps.com/u/SRblackbird)\
**Post date:** [October 7, 2021, 2:24am UTC](https://community.glideapps.com/t/switch-to-google-sheets/32743/1 "2021-10-07T02:24:36Z")

</div>

Is it possible to switch from Glide Table to Gsheets after I’ve already started building my app? If yes, how?

I don’t want to copy and paste 300 rows of data.

Conversely, if I copy the app how could I apply my Gsheet to the copied app instead of GTable?

---

<div class="post-metadata">

**Author:** ![david](https://sea2.discourse-cdn.com/flex002/user_avatar/community.glideapps.com/david/32/62831_2.png) [@david](https://community.glideapps.com/u/david)\
**Post date:** [October 7, 2021, 2:32am UTC](https://community.glideapps.com/t/switch-to-google-sheets/32743/2 "2021-10-07T02:32:37Z")

</div>

You can export your app’s data in your setting, which emails you a spreadsheet file you can import into Google Sheets.

---

<div class="post-metadata">

**Author:** ![SRblackbird](https://avatars.discourse-cdn.com/v4/letter/s/3ab097/32.png) [@SRblackbird](https://community.glideapps.com/u/SRblackbird)\
**Post date:** [October 7, 2021, 4:55am UTC](https://community.glideapps.com/t/switch-to-google-sheets/32743/3 "2021-10-07T04:55:53Z")

</div>

David,

Thanks for the response. The issue is the 300 rows of data is in the Google Sheet. So I would need to import data from Gsheet to the Gtable, which I’ve read can’t be done at this point.

Any other ideas?

Thank you

---

<div class="post-metadata">

**Author:** ![ThinhDinh](https://sea2.discourse-cdn.com/flex002/user_avatar/community.glideapps.com/thinhdinh/32/49_2.png) [@ThinhDinh](https://community.glideapps.com/u/ThinhDinh)\
**Post date:** [October 7, 2021, 8:18am UTC](https://community.glideapps.com/t/switch-to-google-sheets/32743/4 "2021-10-07T08:18:52Z")

</div>

Well there’s no straightforward ways to do this. The biggest problem, I think, is not how to get 300 rows of data in the right place (you can export to Sheets like David said, if you want to import something to Glide table then automate it using the thread below).

> [@robot Importing data to Glide by use of robot (RPA)](https://community.glideapps.com/t/importing-data-to-glide-by-use-of-robot-rpa/29008):
>
> Challenge 1 In this moment of time it is not possible to import data (or paste chunks of data) into Glide. @Manu.n has shown a way to import a row at a time from Google sheets to Glide tables which is quite handy if you have not to much data to import. But if you have hundreds or thousands of rows this approach is not the way to go. 
> 
> > **Manu.n's approach - great for a smaller number of rows**
> >
> > \<a href="https://community.glideapps.com/t/import-data-from-excel-sheets-into-glide-table/20184/…

But how to get all the computed columns, if you don’t have that many computed columns then I think you can re-do the work in a not too big timespan.
